











Fibconet ayaa soo saarta 12 taxane dibadda ah xidhidhiyaha fibre optic (sidoo kale loo yaqaan xirid wadajir ah, xirida fiilooyinka, ama af-duubka goobta daasadaha qubbada) ee OSP kala qaybinta inta u dhaxaysa quudiyaha, fiilooyinka qaybinta iyo daadinta. Awooddu waxay u dhaxaysaa 12 xudunta loogu talagalay isgoysyada FTTH ilaa 840 xudunta u ah laf dhabarta iyo dhibco kala goysyada dheer. Lagu xidhay IP68, guryaha waa PP+GF, PPR ama polymer-ka biraha ku xidhan ee leh a 15 nolosha goobta naqshadeynta 25-sano. Qaybteenna indhaha ee dadban waxay dib u raacaan 1994, iyo isla qalabaynta guriga iyo edbinta tijaabinta ee loo dhisay kala qaybinta PLC ayaa hadda wadda xariiqda xidhitaanka.

Laba nooc oo jirka ah ayaa daboolaya labada hab ee rakibidda OSP: qubbad (toosan) xirid tiirka u ah, darbiga iyo kala-goysyada tooska ah ee la aasay, iyo jiifsan (khad) xirid god biyood, godka gacanta iyo sawirka-8 dhibcood anteenada goglan. Selected dome models ship pre-loaded with 1×8 or 1×16 PLC splitters and act as PON hub points inside a Quick ODN / pre-terminated FTTH deployment. Enclosures accept mechanical, heat-shrink or silicone sealing per model.
The sections below list the 12 models grouped by body type, then cover Dome-vs-Horizontal selection logic, technical specifications, manufacturing capability, baakad, FAQ, and a quotation channel.
Cylindrical body with a single base plate carrying all cable ports. Best suited to pole-mount, wall-mount and direct-buried joints where cables enter from one end. The two splitter-loaded models below double as PON hub points inside a Quick ODN deployment.
| Qaabka | Core Capacity | Qoondayn / Qiimaynta | PON hub role | Isticmaalka caadiga ah |
|---|---|---|---|---|
| IK10 IP68 96 Core Huawei-Compatible Access Terminal Closure | 96 xudunta u ah | IP68 / IK10 impact | - | Huawei-standard access node, pole or wall |
| 96/144 Core Dome Closure (Tiirka / Darbiga / Dhulka hoostiisa) | 96–144 cores | IP68 | - | Multi-scenario OSP splice, any mount |
| 96/144 Xudunta 100 kPa 25-Year Splice Closure | 96–144 cores | IP68 / 100 kPa air-pressure hold | - | Long-life backbone joints requiring pressure test |
| 144 Core Metal-Bracket IP68 Dome Closure | 144 xudunta u ah | IP68 | - | Metal-braced tray for high-vibration or heavy cable load |
| IP68 288 Core High-capacity Dome Closure | 288 xudunta u ah | IP68 | - | High-density backbone splice point |
| 1:8 / 1:16 PLC Splitter IP68 Dome (22000 N / 10 cm cable retention) | Splitter-loaded dome | IP68 / 22000 N cable pull | Yes — Quick ODN hub | PON hub combining splice and 1×8 or 1×16 splitting |
| IP68 1:8 PLC Splitter Pre-terminated FAT Closure | Kala-bax + FAT ports | IP68 | Yes — pre-terminated PON hub | Plug-and-play PON hub with drop-cable ports |
Elongated body with cable ports at both ends. Preferred for manhole, handhole, aerial figure-8 span and any splice point where cables enter and exit in the same axis.
| Qaabka | Core Capacity | Qoondayn / Qiimaynta | Isticmaalka caadiga ah |
|---|---|---|---|
| Pp + gf / PPR IN-LINE 2-in-2-out 12 Xiritaanka Kaabsan Xuddunta | 12 xudunta u ah | IP68 / mechanical seal | FTTH drop junction, aerial or handhole |
| 48 Core 1-in-2-out Inline Cable Closure | 48 xudunta u ah | IP68 | Small branch inline splice |
| 15+ Service Years PP+GF IP68 2-in-2-out Inline Closure | Ilaa 96 xudunta u ah | IP68 / 15+ years field life | Mid-density distribution splice with long life claim |
| 96 Core Silicone-Protection Horizontal Splice Closure (La habeeyay) | 96 xudunta u ah | IP68 / silicone sealing | Manhole splice with elevated moisture and chemical exposure |
| 576 / 840 Core Heat-Shrink Seal IP68 Cable Closure | 576–840 cores | IP68 / kulayl-yaraan | Long-haul backbone splice, high-count ribbon or loose-tube |
A splice closure protects, seals and organises spliced fibers at any point along an OSP cable route. The body shape follows the physical install location, not the fiber count.
| Dome (Vertical) | Horizontal (Inline) | |
|---|---|---|
| Cable entry | All ports on one base plate | Ports at two opposite ends |
| Best install | Tiirka, derbi, la aasay, hand-hole from top | Manhole, aerial figure-8 span, tray-mount inline |
| Typical core count | 96, 144, 288 — expandable via added trays | 12, 48, 96, 576, 840 — scales with body length |
| Access | Lift the dome, all splice trays exposed | Split the shell, access trays along the axis |
| PLC splitter loading | Common (PON hub role) | Less common, used mainly for pure splice |

| Core capacity | Network role | Body type shortlist |
|---|---|---|
| 12–48 cores | FTTH hoos u dhac / distribution junction | Inline, mechanical seal |
| 96 xudunta u ah | Access-layer PON node, base-station splice | Dome (Huawei-compatible or metal-bracket) |
| 144 xudunta u ah | Distribution-layer aggregation | Dome, tray-expandable |
| 288 xudunta u ah | Metro backbone splice point | Dome, awood sare |
| 576–840 cores | Laf-dhabar-dheer, high-count ribbon | Inline, heat-shrink seal |
Ogow: the values below are family-typical ranges across the 12 taxane, ma aha xaashi xogeed-SKU ah. Na weydiiso warbixinta tijaabada gaarka ah ee moodeelka ee heerka RFQ; waxaan ku soo direynaa lambarka qaybta modelka hoostiisa.
| Halbeegga | Qiimaha caadiga ah | Ka hadlid |
|---|---|---|
| Core capacity | 12 ku 840 xudunta u ah | Qaabkiiba; expandable via added splice trays |
| Qalabka guryaha | Pp + gf, PPR, ABS+PC or metal-braced polymer | Selected per model and environment |
| darajada xidhidhiyaha | IP68 | All outdoor OSP models |
| Impact resistance | Up to IK10 on selected models | Metal-bracket and IK10-rated series |
| Habka xiridda | Makaanik / kulayl-yaraan / silicone | Qaabkiiba |
| Air-pressure hold | 100 kPa on selected models | For pressurised OSP networks |
| Haysashada fiilada (axial pull) | Ilaa 22,000 N / 10 cm on selected models | Splitter-loaded dome rated for heavy pull |
| Cable entry ports | 1-in-2-out, 2-in-2-out, 4-in-4-out per model | Additional ports available on custom builds |
| Main cable diameter | Typically Φ7–Φ16 mm | Model-dependent; branch cable Φ5–Φ11.5 mm |
| saxaarad kala goyn | Stackable, 12 ama 24 splices per tray | Both fusion and mechanical splice trays supported |
| Heerkulka shaqada | −40°C to +65°C | Storage −35°C to +55°C per shipping spec |
| Design field life | 15 ku 25 years outdoor | Qaabkiiba; PP+GF with UV additive supports 25 sanado |
| Reference test standards | IEC 61753-1, YD/T 814, GR-771 | Applied per project requirement |
Fibconet’s optical communication background traces back to the early 1990s. Our passive optical component manufacturing roots start in 1994 with a PLC splitter factory; the company was formally structured in 2000 and today operates with 300+ core staff and an extended multi-site manufacturing network of up to 800 shaqaalaha iyo injineerada across China. The same tooling and test discipline built for high-count PLC splitter production now runs the splice closure line, including injection molding of PP+GF and PPR housings, splice tray forming, and full-load assembly.
Splice closures are only as reliable as the materials inside them. Waxaan xakameyneynaa xirmooyinka korka ah halkii aan ka ahaan lahayn kaliya tallaabada kulanka:

Fibconet operates under an integrated ISO 9001 / ISO 14001 / ISO 45001 management system covering quality, environment and occupational health & amni. Raw material RoHS reports are supplied by default with every shipment.
Product-level compliance is issued per model and per target market. Depending on the model list and destination country, we can support TAN, RoHS, REACH, ah, Itl, CPR, ANATEL, CCA, Tlc and other market-entry documents. Applicable test reports against IEC 61753-1, YD/T 814 iyo Telcordia GR-771 reference standards are provided at project scale.
Certification applicability varies by product and project requirements. Send us your target market and the model list, waxaanan ku celinaynaa shahaadadii lagu dabaqi lahaa oraahda.
All four are the same product family — an outdoor enclosure that houses and seals spliced fibers along an OSP cable route. “Splice closure” iyo “joint closure” are the standard English terms. “Dome can” iyo “炮筒” are field slang for the dome (toosan) body style. The Chinese term “熔接包” refers to the same category and is common in Chinese-language RFQs from Southeast Asia and Africa.
A splice closure protects and organises spliced fibers along an OSP cable route; there is no active drop-cable termination for subscribers. A distribution box (BARUUR) terminates drop cables into adapter ports and often houses the last-mile splitter. Splice closures sit deeper in the network; distribution boxes sit at the drop point closest to homes.
Choose dome when cables enter from a single direction — pole-mount, darbi-jiif, la aasay, or hand-hole accessed from above. Choose inline when cables enter and exit along the same axis — manhole splice, aerial figure-8 span, or tray-mount along a linear run.
Match the closure to the largest cable at the splice point plus a spare tray for future expansion. FTTH drop junctions typically use 12–48 core inline closures. PON access nodes use 96–144 core dome closures. Metro backbone splices use 288 xudunta u ah; long-haul trunk splices use 576 ama 840 cores in heat-shrink inline bodies.
For direct-buried and pressurised networks, use a mechanical-seal dome with 100 kPa air-pressure hold; the seal is verifiable in the field and re-enterable for future splice work. Heat-shrink is more permanent but not re-enterable without cutting.
Haa. Dome closures can be shipped with a 1×8 or 1×16 PLC splitter pre-terminated at factory. The 1:8 / 1:16 PLC Splitter Dome model is rated for 22,000 N / 10 cm cable retention so the housing tolerates heavy drop-cable pull. Splitter chips are Shijia or Korean-source, and pigtails use G.657.A2 fiber from major Chinese fiber brands.
PP+GF and PC+ABS housings with a UV stabiliser additive package hold 15 ku 25 years of outdoor service, depending on model. Ask us for the specific model’s material spec if your project tender requires a stated design life.
Haa. IEC 61753-1, YD/T 814 and GR-771 test reports are available per model. Raw material RoHS reports ship by default. Market-entry certificates such as CE, REACH, ah, Itl, CPR, ANATEL, CCA and TLC are issued per model and per target market. If a certificate you need is not already on file, we can arrange third-party testing at project scale.
MOQ starts at 100 pcs on standard configuration; custom builds are typically 500–1,000 pcs. Standard orders ship in 15–25 days; custom builds in 25–40 days. [TBC: confirm exact values per model at RFQ stage.]
Haa. Pole-mount and wall-mount hardware is included on the dome closures. Aerial figure-8 mounting kits for inline closures are supplied on request. Manhole tray mounts and cable-management brackets are quoted with the closure.
Haa. Our splitter-loaded dome closures — the 1:8 / 1:16 PLC Splitter Dome and the pre-terminated FAT closure — act as PON hub points inside a Quick ODN system. They pair with our pre-terminated drop cables, Hubka MPO, sub boxes and asymmetric splitters to reduce on-site splicing, cut installation labor, and make FTTH rollout more predictable. If your project is a new FTTH build in a labor-cost-sensitive market, ask for a matched Quick ODN configuration when you send the RFQ.
Waxaan kaga jawaabi doonaa gudaha 12 saacadood, fadlan u fiirso iimaylka dabadhilifka ah "@fibconet.com".
Sidoo kale, waxaad tagi kartaa Bogga Xiriirka, kaas oo bixiya foom faahfaahsan.